|
Presenter |
Title |
Poster
|
Paper
No.
|
I. Status reports from institutes/laboratories
|
| |
K.W. Seo
(Y.C. Kim) |
PLS Alignment and Other
Activities |
 |
THP1-01
|
II.
Survey and alignment
|
| |
R. Beunard |
The alignment strategy
which will be used for the LINAC superconducting cryomodules. |
|
THP2-01

|
|
M. Emamian
|
Alignment Approach for
the HIGS Booster Ring at Duke Free Electron Laser Lab |
|
THP2-02
|
| |
K. Harada |
The alignment and the
displacement of the magnet at the Photon Factory ring |
|
THP2-03
|
| |
M. Ke |
The Alignment of First 7
Front Ends at SSRF |
 |
THP2-04
|
| |
T. Morishita |
Alignment of Cavities and
Magnets at J-PARC linac |
 |
THP2-05
|
|
M. Satoh |
Laser-based alignment
system for the KEKB Linac |
|
THP2-06
|
| |
N. Tani |
Survey and Alignment of
the J-PARC 3-GeV Synchrotron |
|
THP2-07
|
III.
Alignment instrumentation, software and methods
|
|
R. Ruland
(B. Fuss) |
Open Standard KML
Interface for LCLS Survey Data |
|
THP3-01
|
| |
R. Ruland
(G. Gassner) |
Portable Wire Measurement
System |
|
THP3-02
|
| |
R. Ruland
(C. LeCocq) |
Revisiting the SLAC Linac
Laser Alignment System |
|
THP3-03
|
|
C. Uribe
Estrada |
The LiCAS Rapid Tunnel
Reference Surveyor. The status after commissioning. |
|
WE012
|
|
J.P. Quesnel
(H. van der Graaf) |
RasClic: a 3-point
alignment system over a long distance |
|
THP3-05
|
| |
C. Zhang |
A Four Hundred Meters
Long Underground HLS at XFEL/SPring-8 Site |
 |
THP3-06
|
IV.
Fiducialisation and quality control
|
| |
D.P.
Sanderson |
Fiducialization of the
Cryomodules for the NSCL Reaccelerator Project |
 |
THP4-01
|
V.
Ground motion
|
|
|
|
|
|
VI.
Survey and alignment of instruments and detectors, GPS, etc.
|
|
N. Ohuchi |
Alignment of SRF cavities
in the STF cryomodules |
|
THP6-01
|