Starting
time |
Ending
time |
Presenter |
Title |
Talk |
Paper
No.
|
Session
1: Survey and
alignment, cont. (C. Zhang)
|
|
09:00
|
09:20
|
D. Missiaen |
The final alignment of
the LHC |
 |
TU001

|
|
09:20
|
09:40
|
B.O. Oshinowo |
Survey and Alignment of
the Fermilab
MuCool Test Area Beam Line |
 |
TU002

|
|
09:40
|
10:00
|
M. Masuzawa |
Magnet installation and
alignment for the
Fuji Test Beam Line at KEKB |
 |
TU003

|
|
10:00
|
10:20
|
R. Beunard |
Survey and Alignment
Concept selected for
installation of the SPIRAL2 accelerator devices |
 |
TU004

|
|
|
<
Coffee
break 10:20 - 10:40 > |
|
|
Session
2: Survey and
alignment, cont. (M. Masuzawa)
|
|
10:40
|
11:00
|
H. Kimura
|
Ground displacement at
BL29XUL - 1 km
beamline - in SPring-8 |
 |
TU005
|
|
11:00
|
11:20
|
M. Yabashi
|
Undulator alignment for
the SPring-8 XFEL |
 |
TU006 |
|
11:20
|
11:40
|
H. Souda |
Alignment of S-LSR |
 |
TU007

|
|
|
<
Lunch 11:40 - 13:20 > |
|
|
Session
3: Alignment instrumentation,
software and methods (M. Schloesser)
|
|
13:20 |
13:40 |
R. Ruland
(G. Gassner) |
Laser Tracker Test
Facility at SLAC |
 |
TU008
|
|
13:40 |
14:00 |
D. Missiaen |
The remote positioning
of the LHC inner
triplets |
 |
TU009

|
|
14:00 |
14:20 |
A. Jain |
Vibrating Wire R&D
for Alignment of
Multipole Magnets in NSLS-II |
 |
TU010

|
|
14:20 |
14:40 |
M. Warden |
MONALISA: A precise
system for
accelerator component position monitoring |
 |
TU011

|
|
14:40 |
15:00 |
A. Marbs |
Final concept of the
photogrammetric
alignment system RALF for high-radiation areas of FAIR |
 |
TU012

|
|
|
<
Coffee
break 15:00 - 15:30 > |
|
|
Session
4: Alignment instrumentation,
software and methods, cont. (C. Curtis)
|
|
15:30 |
15:50 |
A. Dumont |
The use of simulation to
optimise the
integration of 3D optical metrology techniques and stability monitoring
with capacitive sensors into an alignment concept for the assembly of
ITER |
 |
TU013
|
|
15:50 |
16:10 |
X. He |
DESIGN AND DISTRIBUTION
OF HLS IN SSRF |
 |
TU014

|
|
16:10 |
16:30 |
A. Chupyra
|
CAPACITIVE AND
ULTRASONIC HYDROSTATIC LEVEL SENSORS |
 |
TU015

|
Survey and
alignment, cont.
|
|
16:30 |
16:50 |
X. Wang |
BEPCII pre-alignment
project and the
theory of hold level adjustment |
 |
TU016
|
|
16:50 |
17:10 |
B. Li |
The alignment of BEPCII
ring and orbit
smoothing |
 |
TU017
|