THE CONTROL SYSTEM FOR HIRFL

Tuanhua Huang

Institute of Modern Physics
Academia Sinica
Lanzhou, Gansu, 730000
The People's Republic of China


The status of the control system for HIRFL is presented. Most of the sub-control-systems with micro-computers were fulfilled by 1988, which had primarily provided for the beam tuning for 4 years. The sub-control-system for SFC was renewed when SFC and ECR were reconstructed by April 1992. After having done a lot of preparatory job, in 1993, the connection of the sub-control-systems with the central computer (VAX8350) were fulfiled and our SSC was operated on the central console. Now all the sub-system in HIRFL control system are being linked as a central-distributed one by DECnet-DOS technique.