10–15 Sept 2023
Tsukuba International Congress Center (EPOCHAL)
Asia/Tokyo timezone
WAO2023 is over. Thanks for your support. Please bring fruitful discussions at WAO2023 back to your community. See you at WAO2025 hosted by Canadian Light Source.

PO05-The operation status of linac and multi-beamlines and beam tuning procedure for beam service

12 Sept 2023, 14:00
1h 30m
Tsukuba International Congress Center (EPOCHAL)

Tsukuba International Congress Center (EPOCHAL)

Speaker

Sang-pil Yoon (KOMAC)

Description

The Korea Multi-Purpose Accelerator Complex (KOMAC) started operating the 100 MeV proton linac in 2013. Currently, the linac is equipped with four proton irradiation beamlines and it provides 20 MeV and 100 MeV proton beams to a wide range of users. The annual accelerator operation can be divided into beam service running according to a user's request and the machine study run. For the stable operation of the accelerator, we regularly performed beam tuning to meet the specific user requirements. In addition, performance improvement plans are set up and anti-aging programs are prepared. This paper describes the operating status of the KOMAC proton accelerator along with the beam tuning procedure for the beam service.

Presentation materials